Formwork Construction and Stripping — Safe Work Method Statement

Covers the construction, erection, and stripping of formwork systems for concrete pours including footings, slabs, walls and columns. Addresses manual handling of formwork panels, use of form oil and release agents, working near crane operations, and working at heights on elevated formwork systems.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 208 - Managing risks of plant

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety glasses (medium impact) (AS/NZS 1337.1) Steel-cap safety boots (penetration-resistant sole) (AS/NZS 2210.3) Cut-resistant gloves (AS/NZS 2161.3) Chemical-resistant gloves (for release agents) (AS/NZS 2161.10) Full body harness (heights work) (AS/NZS 1891.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1)

Australian Standards Referenced

AS 3610 — Formwork for Concrete AS/NZS 4994.1 — Temporary Edge Protection AS/NZS 1891.1 — Industrial Fall-Arrest Systems — Harnesses and Ancillary Equipment AS/NZS 1801 — Occupational Protective Helmets AS/NZS 1337.1 — Personal Eye Protection AS/NZS 2210.3 — Occupational Protective Footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Carpentry Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Carpentry

5+ packs delivered to Australian tradies
$16.96 Buy Now