Formwork Construction and Stripping — Safe Work Method Statement
Covers the construction, erection, and stripping of formwork systems for concrete pours including footings, slabs, walls and columns. Addresses manual handling of formwork panels, use of form oil and release agents, working near crane operations, and working at heights on elevated formwork systems.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 208 - Managing risks of plant
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety glasses (medium impact) (AS/NZS 1337.1)
Steel-cap safety boots (penetration-resistant sole) (AS/NZS 2210.3)
Cut-resistant gloves (AS/NZS 2161.3)
Chemical-resistant gloves (for release agents) (AS/NZS 2161.10)
Full body harness (heights work) (AS/NZS 1891.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Australian Standards Referenced
AS 3610 — Formwork for Concrete
AS/NZS 4994.1 — Temporary Edge Protection
AS/NZS 1891.1 — Industrial Fall-Arrest Systems — Harnesses and Ancillary Equipment
AS/NZS 1801 — Occupational Protective Helmets
AS/NZS 1337.1 — Personal Eye Protection
AS/NZS 2210.3 — Occupational Protective Footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Carpentry Pack — Save $42
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Carpentry
$16.96
Buy Now