Timber Fence Construction — Safe Work Method Statement
Covers construction of timber paling, picket and slat fences including post setting, rail fixing, paling attachment and gate installation. Includes use of power tools, concrete mixing for post footings, and manual handling of timber materials.
5 work steps
9 hazards identified
9 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Fall 2m
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 36 - Hierarchy of control measures
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
WHS Reg 2011, Reg 44 - Duty to provide personal protective equipment
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Fencing Pack — Save $25
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Fencing
$16.96
Buy Now