Concrete Floor Preparation (Grinding, Levelling) — Safe Work Method Statement

Safe work procedures for concrete floor preparation including diamond grinding, shot blasting, crack repair, self-levelling compound application, and surface profiling for subsequent floor covering installation.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Chemicals

Legislation Referenced

WHS Reg 2011, Reg 36 (duty to identify hazards) WHS Reg 2011, Reg 49 (airborne contaminants) WHS Reg 2011, Reg 39 (noise exposure) WHS Reg 2011, Reg 351 - Hazardous chemicals

PPE Requirements

P2 respirator (minimum) or PAPR (AS/NZS 1716) Hearing protection (Class 5) (AS/NZS 1270) Safety glasses (AS/NZS 1337.1) Safety footwear (non-slip) (AS/NZS 2210.3) Nitrile gloves (AS/NZS 2161.10) Knee pads (AS/NZS 2210.3)

Australian Standards Referenced

AS/NZS 1716 — Respiratory protective devices AS/NZS 1715 — Selection, use and maintenance of respiratory protective equipment AS/NZS 1270 — Acoustics – Hearing protectors Safe Work Australia Workplace Exposure Standard for Respirable Crystalline Silica
$16.96 $19.95 15% off
Buy This Document Buy Complete Flooring Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Flooring

5+ packs delivered to Australian tradies
$16.96 Buy Now