Epoxy and Resin Flooring — Safe Work Method Statement

Safe work procedures for the application of epoxy, polyurethane, and resin floor coatings in commercial and industrial settings, including surface preparation, primer, base coat, and top coat application.

A Safe Work Method Statement (SWMS) is a legal requirement under WHS Regulations for any high-risk construction work in Australia. It identifies hazards, assesses risks using a 5×5 matrix, and sets out control measures following the hierarchy of controls. Our SWMS documents reference specific WHS Regulation clauses and AS/NZS standards for every piece of PPE, giving you audit-ready documentation that satisfies regulator requirements in every state and territory.

5 work steps 7 hazards identified 7 control measures 7 PPE items specified 5 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Chemicals Contaminated Atmosphere

Legislation Referenced

WHS Reg 2011, Reg 36 (duty to identify hazards) WHS Reg 2011, Reg 49 (airborne contaminants) WHS Reg 2011, Reg 351 (hazardous chemicals) WHS Reg 2011, Reg 351 - Hazardous chemicals WHS Reg 2011, Reg 291(1)(l) - Contaminated or flammable atmosphere

PPE Requirements

Nitrile chemical-resistant gloves (0.3 mm min) (AS/NZS 2161.10) Chemical splash goggles (AS/NZS 1337.1) Half-face respirator with A1B1E1 cartridge (AS/NZS 1716) PAPR with P3 filter (grinding phase) (AS/NZS 1716) Disposable coveralls (Category III Type 5/6) Safety footwear (AS/NZS 2210.3) Spike shoes (wet epoxy walking) (N/A)

Australian Standards Referenced

AS/NZS 1580 — Paints and related materials – Methods of test AS/NZS 2311 — Guide to the painting of buildings AS/NZS 1716 — Respiratory protective devices AS/NZS 1715 — Selection, use and maintenance of respiratory protective equipment Safe Work Australia Workplace Exposure Standard for Respirable Crystalline Silica
$67.95
Buy This Document Buy Complete Flooring Pack — Save $146
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Not sure your existing swms is compliant? Run the free WHS compliance check →

Also Available As

Using This SWMS On Site

Keep the SWMS where the work is being carried out and have it available if the principal contractor asks for it. Workers named on it sign the acknowledgement page before starting, and it gets reviewed whenever the method, the site conditions or the crew change.

SWMS — Common Questions

When is a SWMS legally required?

Under WHS Regulation 299, a SWMS must be prepared before any high-risk construction work (HRCW) begins. This includes work at heights, demolition, work near energised electrical, excavation over 1.5m, and 18 other defined activities.

What should a SWMS include?

A compliant SWMS must identify the high-risk work, list hazards and risks, describe control measures using the hierarchy of controls, and be signed by the workers involved. Our documents include all required elements plus specific legislation references.

Who needs to sign a SWMS?

The PCBU (or employer in Victoria) who commissions the work, and every worker carrying out the high-risk construction work, must sign the SWMS before work begins.

More SWMS Documents for Flooring

Not the right fit? Refund available if the document doesn't match your trade.
$67.95 Buy Now