Commercial Curtain Wall and Shopfront Glazing — Safe Work Method Statement

Covers installation of commercial curtain wall systems, shopfront glazing, frameless glass doors and structural glazing to commercial buildings. Includes crane-assisted glass panel lifting, work at height from scaffolds and elevated work platforms, and structural silicone application in accordance with AS 1288 and AS/NZS 4667.

5 work steps 9 hazards identified 9 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Fall 2m Powered Mobile Plant

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 78 - Meaning of high risk construction work WHS Reg 2011, Reg 291(1)(a) - Risk of a person falling more than 2 metres WHS Reg 2011, Reg 291(1)(f) - Involves a risk of a person being trapped by a moving part of plant WHS Reg 2011, Part 4.5 - Falls WHS Reg 2011, Part 5.1 - Construction work

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Glazing Pack — Save $25
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Glazing

5+ packs delivered to Australian tradies
$16.96 Buy Now