Rigid Foam Board Insulation Installation — Safe Work Method Statement

Covers installation of rigid foam board insulation panels including expanded polystyrene (EPS), extruded polystyrene (XPS) and polyisocyanurate (PIR) to walls, floors and roofs. Includes cutting, adhesive application, mechanical fixing and finishing in accordance with AS/NZS 4859.1.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Fall 2m

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 44 - Duties of persons conducting businesses or undertakings that use hazardous chemicals

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1) Respiratory protection (P2) (AS/NZS 1716) Disposable coveralls (General duty)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Insulation Pack — Save $25
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Insulation

5+ packs delivered to Australian tradies
$16.96 Buy Now