Roof Sarking and Building Wrap Installation — Safe Work Method Statement
Covers installation of roof sarking membranes, wall wrap and vapour barriers to residential and commercial building envelopes. Includes work on roof structures, stapling and taping of membrane sheets, and working at height on trusses and purlins in accordance with AS/NZS 4200.1 and AS/NZS 1891.1.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Fall 2m
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 78 - Meaning of high risk construction work
WHS Reg 2011, Reg 291(1)(a) - Risk of a person falling more than 2 metres
WHS Reg 2011, Part 4.5 - Falls
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Respiratory protection (P2) (AS/NZS 1716)
Disposable coveralls (General duty)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$67.96
$79.95
15% off
Buy This Document
Buy Complete Insulation Pack — Save $77
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Insulation
$67.96
Buy Now