Elevated and Overhead Sign Installation — Safe Work Method Statement

Safe work procedures for installation of elevated signs, overhead gantry signs, pylon signs, and building-mounted signs at height including structural mounting, electrical connections, and crane-assisted installation.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights Powered Mobile Plant

Legislation Referenced

WHS Reg 2011 r.78 (falls — general duty) WHS Reg 2011 r.79 (falls — minimising risk) WHS Reg 2011 r.291 (high risk construction work) WHS Reg 2011 r.214 (management of risks to health and safety)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Signage & Line Marking Pack — Save $25
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Signage & Line Marking

5+ packs delivered to Australian tradies
$16.96 Buy Now