Existing Tile Removal and Substrate Preparation — Safe Work Method Statement

Safe work procedures for removal of existing floor and wall tiles including mechanical and manual removal methods, substrate repair, and preparation for retiling.

4 work steps 5 hazards identified 5 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Asbestos

Legislation Referenced

WHS Reg 2011 r.214 (management of risks to health and safety) WHS Reg 2011 r.213 (duty to identify hazards) WHS Reg 2011 r.420 (asbestos — identification)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1) Knee pads (General duty) Hearing protection (when cutting) (AS/NZS 1270)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Tiling Pack — Save $34
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Tiling

5+ packs delivered to Australian tradies
$16.96 Buy Now