Below-Ground and Tanking Waterproofing — Safe Work Method Statement
Covers application of below-ground waterproofing membranes and tanking systems to basement walls, retaining walls, lift pits and substructures. Includes cementitious coating, bituminous membrane, sheet membrane and drainage cell installation in accordance with AS 4654 and AS 3740.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Fall 2m
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 78 - Meaning of high risk construction work
WHS Reg 2011, Reg 291(1)(a) - Risk of a person falling more than 2 metres
WHS Reg 2011, Part 3.2 - Confined spaces
WHS Reg 2011, Reg 44 - Duties of persons conducting businesses or undertakings that use hazardous chemicals
WHS Reg 2011, Part 7.1 - Hazardous chemicals
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Waterproofing Pack — Save $25
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Waterproofing
$16.96
Buy Now