Waterproofing Inspection and Flood Testing — Safe Work Method Statement

Covers visual inspection of waterproofing membranes, dry film thickness testing, flood testing procedures and documentation for compliance certification. Includes inspection of wet areas, balconies, roofs and below-ground waterproofing installations in accordance with AS 3740, AS 4654 and AS/NZS 4858.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Fall 2m

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 78 - Meaning of high risk construction work WHS Reg 2011, Reg 291(1)(a) - Risk of a person falling more than 2 metres WHS Reg 2011, Part 4.5 - Falls WHS Reg 2011, Reg 39 - Provision of information, training and instruction

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Waterproofing Pack — Save $77
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Waterproofing

5+ packs delivered to Australian tradies
$67.96 Buy Now