Bulk Earthmoving and Site Cut — Safe Work Method Statement

Safe work procedures for bulk earthmoving operations including site clearing, cut and fill, stockpiling, and site levelling using excavators, dozers, scrapers, and dump trucks.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Powered Mobile Plant Excavation

Legislation Referenced

WHS Reg 2011 r.214 (management of risks to health and safety) WHS Reg 2011 r.291 (high risk construction work) WHS Reg 2011 r.213 (duty to identify hazards) WHS Reg 2011 r.39 (provision and use of plant)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Civil Works Pack — Save $51
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Civil Works

5+ packs delivered to Australian tradies
$16.96 Buy Now