Road Base Preparation and Sealing — Safe Work Method Statement
Safe work procedures for road base preparation including subgrade preparation, placement and spreading of aggregate base and sub-base materials, priming, and bituminous sealing of road surfaces.
5 work steps
10 hazards identified
10 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Powered Mobile Plant
Traffic Corridor
Legislation Referenced
WHS Reg 2011 r.214 (management of risks to health and safety)
WHS Reg 2011 r.291 (high risk construction work)
WHS Reg 2011 r.315 (traffic management)
WHS Reg 2011 r.213 (duty to identify hazards)
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Civil Works Pack — Save $51
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Civil Works
$16.96
Buy Now