Minor Bridge and Culvert Construction — Safe Work Method Statement

Safe work procedures for construction of minor bridges, box culverts, and pipe culvert headwalls including excavation, formwork, steel fixing, concrete placement, and backfill.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights Excavation Powered Mobile Plant

Legislation Referenced

WHS Reg 2011 r.291 (high risk construction work) WHS Reg 2011 r.306 (excavation work) WHS Reg 2011 r.78 (falls — general duty) WHS Reg 2011 r.79 (falls — minimising risk)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Civil Works Pack — Save $187
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Civil Works

5+ packs delivered to Australian tradies
$67.96 Buy Now