Stormwater Drainage Pipe Installation — Safe Work Method Statement
Safe work procedures for installation of stormwater drainage systems including trench excavation, pipe laying (RCP and PVC), jointing, backfill, and connection to pits and headwalls.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011 r.291 (high risk construction work)
WHS Reg 2011 r.306 (excavation work)
WHS Reg 2011 r.307 (ground conditions — excavation)
WHS Reg 2011 r.305 (excavation work — shoring)
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$67.96
$79.95
15% off
Buy This Document
Buy Complete Civil Works Pack — Save $187
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Civil Works
$67.96
Buy Now