Stormwater Drainage Pipe Installation — Safe Work Method Statement

Safe work procedures for installation of stormwater drainage systems including trench excavation, pipe laying (RCP and PVC), jointing, backfill, and connection to pits and headwalls.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Excavation Powered Mobile Plant

Legislation Referenced

WHS Reg 2011 r.291 (high risk construction work) WHS Reg 2011 r.306 (excavation work) WHS Reg 2011 r.307 (ground conditions — excavation) WHS Reg 2011 r.305 (excavation work — shoring)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Civil Works Pack — Save $187
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Civil Works

5+ packs delivered to Australian tradies
$67.96 Buy Now