Engineered Retaining Wall Construction — Safe Work Method Statement
Safe work procedures for construction of engineered retaining walls including gravity, cantilever, crib, and reinforced soil wall types, covering excavation, foundation preparation, wall erection, and drainage installation.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Powered Mobile Plant
Working At Heights
Legislation Referenced
WHS Reg 2011 r.291 (high risk construction work)
WHS Reg 2011 r.306 (excavation work)
WHS Reg 2011 r.78 (falls — general duty)
WHS Reg 2011 r.214 (management of risks to health and safety)
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$67.96
$79.95
15% off
Buy This Document
Buy Complete Civil Works Pack — Save $187
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Civil Works
$67.96
Buy Now