Commercial Demolition (Internal Strip-Out) — Safe Work Method Statement
Safe work procedures for internal strip-out and fitout demolition in commercial buildings including removal of partitions, ceilings, floor coverings, mechanical services, and fitout elements while maintaining building structure.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Demolition
Legislation Referenced
WHS Reg 2011, Reg 142 (demolition licensing)
WHS Reg 2011, Reg 291(1)(d) (SWMS high risk)
PPE Requirements
Hard hat (AS/NZS 1801)
Safety glasses (AS/NZS 1337.1)
P2 respirator (AS/NZS 1716)
Safety footwear (AS/NZS 2210.3)
Cut-resistant gloves (AS/NZS 2161.3)
High-visibility vest (AS/NZS 4602.1)
Hearing protection (AS/NZS 1270)
Australian Standards Referenced
AS 2601 — The demolition of structures
Safe Work Australia Code of Practice — Demolition work
AS/NZS 3000 — Wiring Rules
Safe Work Australia Code of Practice — How to manage and control asbestos in the workplace
$16.96
$19.95
15% off
Buy This Document
Buy Complete Demolition Pack — Save $64
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Demolition
$16.96
Buy Now