Concrete Cutting and Core Drilling — Safe Work Method Statement
Safe work procedures for concrete cutting using wall saws, floor saws, wire saws, and core drilling, including dust and slurry management, structural considerations, and service location.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Demolition
Legislation Referenced
WHS Reg 2011, Reg 36 (duty to identify hazards)
WHS Reg 2011, Reg 49 (airborne contaminants)
WHS Reg 2011, Reg 39 (noise exposure)
PPE Requirements
Hard hat (AS/NZS 1801)
Safety glasses or face shield (AS/NZS 1337.1)
Hearing protection (Class 5) (AS/NZS 1270)
P2 respirator (AS/NZS 1716)
Safety footwear (non-slip) (AS/NZS 2210.3)
Cut-resistant gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS 2601 — The demolition of structures
AS/NZS 1716 — Respiratory protective devices
AS/NZS 1270 — Acoustics – Hearing protectors
Safe Work Australia Workplace Exposure Standard for Respirable Crystalline Silica
$16.96
$19.95
15% off
Buy This Document
Buy Complete Demolition Pack — Save $64
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Demolition
$16.96
Buy Now