SOP — Tree and Vegetation Removal (Site Clearing)
4 work steps
0 hazards identified
0 control measures
5×5 risk matrix
Worker sign-off section
PPE Requirements
Hard hat with face shield (AS/NZS 1801)
Chainsaw chaps (AS/NZS 4453.3)
Hearing protection (Class 5) (AS/NZS 1270)
Safety glasses (AS/NZS 1337.1)
Safety footwear with cut protection (AS/NZS 2210.3)
High-visibility vest (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 4453.3 — Protective clothing for users of hand-held chainsaws
AS/NZS 1270 — Acoustics – Hearing protectors
AS/NZS 1801 — Occupational protective helmets
Safe Work Australia Code of Practice — Managing the risk of falls at workplaces
$33.96
$39.95
15% off
Buy This Document
Buy Complete Demolition Pack — Save $127
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SOP Documents for Demolition
$33.96
Buy Now