SOP — Tree and Vegetation Removal (Site Clearing)

4 work steps 0 hazards identified 0 control measures 5×5 risk matrix Worker sign-off section

PPE Requirements

Hard hat with face shield (AS/NZS 1801) Chainsaw chaps (AS/NZS 4453.3) Hearing protection (Class 5) (AS/NZS 1270) Safety glasses (AS/NZS 1337.1) Safety footwear with cut protection (AS/NZS 2210.3) High-visibility vest (AS/NZS 4602.1)

Australian Standards Referenced

AS/NZS 4453.3 — Protective clothing for users of hand-held chainsaws AS/NZS 1270 — Acoustics – Hearing protectors AS/NZS 1801 — Occupational protective helmets Safe Work Australia Code of Practice — Managing the risk of falls at workplaces
$33.96 $39.95 15% off
Buy This Document Buy Complete Demolition Pack — Save $127
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SOP Documents for Demolition

5+ packs delivered to Australian tradies
$33.96 Buy Now