Tree and Vegetation Removal (Site Clearing) — Safe Work Method Statement
Safe work procedures for tree felling, vegetation clearing, and stump removal as part of construction site preparation, including chainsaw operation, mulching, and root grubbing.
4 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Falling Objects
Legislation Referenced
WHS Reg 2011, Reg 36 (duty to identify hazards)
WHS Reg 2011, Reg 39 (noise exposure)
PPE Requirements
Hard hat with face shield (AS/NZS 1801)
Chainsaw chaps (AS/NZS 4453.3)
Hearing protection (Class 5) (AS/NZS 1270)
Safety glasses (AS/NZS 1337.1)
Safety footwear with cut protection (AS/NZS 2210.3)
High-visibility vest (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 4453.3 — Protective clothing for users of hand-held chainsaws
AS/NZS 1270 — Acoustics – Hearing protectors
AS/NZS 1801 — Occupational protective helmets
Safe Work Australia Code of Practice — Managing the risk of falls at workplaces
$67.96
$79.95
15% off
Buy This Document
Buy Complete Demolition Pack — Save $255
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Demolition
$67.96
Buy Now