SOP — Switchboard Installation and Upgrade
5 work steps
0 hazards identified
0 control measures
5×5 risk matrix
Worker sign-off section
PPE Requirements
Insulated gloves (1000 V rated) (AS/NZS 2225)
Safety glasses (AS/NZS 1337.1)
Arc-rated face shield (AS/NZS 1337.1)
Safety footwear (AS/NZS 2210.3)
Cut-resistant gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 3000 — Wiring Rules
AS/NZS 3008 — Electrical installations – Selection of cables
AS/NZS 60900 — Live working – Hand tools for use up to 1000 V AC and 1500 V DC
AS/NZS 2225 — Insulating gloves for electrical purposes
AS/NZS 3012 — Electrical installations – Construction and demolition sites
AS/NZS 61439.3 — Low-voltage switchgear and controlgear assemblies – Distribution boards
$33.96
$39.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $161
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SOP Documents for Electrical / HVAC / Solar
$33.96
Buy Now