SOP — Switchboard Installation and Upgrade

5 work steps 0 hazards identified 0 control measures 5×5 risk matrix Worker sign-off section

PPE Requirements

Insulated gloves (1000 V rated) (AS/NZS 2225) Safety glasses (AS/NZS 1337.1) Arc-rated face shield (AS/NZS 1337.1) Safety footwear (AS/NZS 2210.3) Cut-resistant gloves (AS/NZS 2161.3)

Australian Standards Referenced

AS/NZS 3000 — Wiring Rules AS/NZS 3008 — Electrical installations – Selection of cables AS/NZS 60900 — Live working – Hand tools for use up to 1000 V AC and 1500 V DC AS/NZS 2225 — Insulating gloves for electrical purposes AS/NZS 3012 — Electrical installations – Construction and demolition sites AS/NZS 61439.3 — Low-voltage switchgear and controlgear assemblies – Distribution boards
$33.96 $39.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $161
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SOP Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies