SOP — Split System Air Conditioning Installation

5 work steps 0 hazards identified 0 control measures 5×5 risk matrix Worker sign-off section

PPE Requirements

Safety glasses (AS/NZS 1337.1) Insulated gloves (AS/NZS 2225) P2 respirator (AS/NZS 1716) Safety footwear (AS/NZS 2210.3) Full body harness (for height work) (AS/NZS 1891.1) Leather rigger gloves (AS/NZS 2161.3)

Australian Standards Referenced

AS/NZS 3823 — Performance of electrical appliances – Air conditioners and heat pumps AS/NZS 3000 — Wiring Rules AS/NZS 1677.2 — Refrigerating systems – Safety requirements for fixed applications AS/NZS 5149 — Refrigerating systems and heat pumps – Safety and environmental requirements AS/NZS 2225 — Insulating gloves for electrical purposes AS/NZS 1891.1 — Industrial fall-arrest systems and devices
$33.96 $39.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $161
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SOP Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$33.96 Buy Now