Fire Hydrant and Hose Reel Installation — Safe Work Method Statement

Safe work procedures for installation of fire hydrant systems and hose reels including large-bore pipework, hydrant valve assemblies, booster connections, and hydrostatic testing to AS 2419.1.

5 work steps 7 hazards identified 7 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights

Legislation Referenced

WHS Reg 2011 r.214 (management of risks to health and safety) WHS Reg 2011 r.78 (falls — general duty) WHS Reg 2011 r.39 (provision and use of plant)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Fire Protection Pack — Save $103
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Fire Protection

5+ packs delivered to Australian tradies
$67.96 Buy Now