Fire Hydrant and Hose Reel Installation — Safe Work Method Statement
Safe work procedures for installation of fire hydrant systems and hose reels including large-bore pipework, hydrant valve assemblies, booster connections, and hydrostatic testing to AS 2419.1.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Legislation Referenced
WHS Reg 2011 r.214 (management of risks to health and safety)
WHS Reg 2011 r.78 (falls — general duty)
WHS Reg 2011 r.39 (provision and use of plant)
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Fire Protection Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Fire Protection
$16.96
Buy Now