Subfloor Preparation and Repair — Safe Work Method Statement

Safe work procedures for subfloor inspection, repair, and preparation including timber bearer and joist replacement, stump adjustment, particle board replacement, and ventilation assessment in residential and commercial buildings.

5 work steps 7 hazards identified 7 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Confined Space

Legislation Referenced

WHS Reg 2011, Reg 36 (duty to identify hazards) WHS Reg 2011, Reg 66 (confined spaces) WHS Reg 2011, Reg 291(1)(f) - Work in or near confined space

PPE Requirements

P2 respirator (AS/NZS 1716) Safety glasses (AS/NZS 1337.1) Safety footwear (AS/NZS 2210.3) Heavy-duty leather gloves (AS/NZS 2161.3) Hearing protection (AS/NZS 1270) Knee pads (AS/NZS 2210.3)

Australian Standards Referenced

AS 1684 — Residential timber-framed construction AS/NZS 1716 — Respiratory protective devices AS/NZS 1270 — Acoustics – Hearing protectors Safe Work Australia Code of Practice — Confined spaces
$16.96 $19.95 15% off
Buy This Document Buy Complete Flooring Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Flooring

5+ packs delivered to Australian tradies
$16.96 Buy Now