SOP — Painting at Heights (Scaffold)
5 work steps
0 hazards identified
0 control measures
5×5 risk matrix
Worker sign-off section
PPE Requirements
Full body harness with shock-absorbing lanyard (AS/NZS 1891.1)
Hard hat (Type 1) (AS/NZS 1801)
Half-face respirator with A1P2 cartridge (AS/NZS 1716)
Safety glasses (medium impact) (AS/NZS 1337.1)
Non-slip enclosed footwear (AS/NZS 2210.3)
Nitrile chemical-resistant gloves (AS/NZS 2161.10)
Suspension trauma relief straps (AS/NZS 1891.4)
Australian Standards Referenced
AS/NZS 4576 - Guidelines for scaffolding safety
AS/NZS 1891.1 - Industrial fall-arrest systems and devices: Harnesses and ancillary equipment
AS/NZS 1891.4 - Industrial fall-arrest systems and devices: Selection, use and maintenance
AS/NZS 2311 - Guide to the painting of buildings
AS/NZS 1716 - Respiratory protective devices
AS/NZS 1801 - Occupational protective helmets
$33.96
$39.95
15% off
Buy This Document
Buy Complete Painting Pack — Save $85
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SOP Documents for Painting
$33.96
Buy Now