Surface Preparation — Safe Work Method Statement

Covers all surface preparation activities prior to painting including water blasting, abrasive blasting, mechanical sanding, chemical cleaning, rust treatment and substrate repair. Applies to timber, masonry, concrete, steel and plasterboard substrates in accordance with AS/NZS 2311 and AS 1627 series.

5 work steps 11 hazards identified 11 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Chemicals

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 44 - Duties relating to hazardous chemicals WHS Reg 2011, Part 4.3 - Noise exposure WHS Reg 2011, Reg 291(1)(d) - Work involving hazardous chemicals

PPE Requirements

P2/P3 particulate respirator (AS/NZS 1716) Half-face respirator with A1P2 cartridge (AS/NZS 1716) Safety goggles (chemical splash) (AS/NZS 1337.1) Class 5 hearing protection (AS/NZS 1270) Chemical-resistant gauntlet gloves (AS/NZS 2161.10) Anti-vibration gloves (AS/NZS 2161.3) Non-slip enclosed footwear (AS/NZS 2210.3) Disposable coveralls (Category III Type 5/6)

Australian Standards Referenced

AS/NZS 2311 - Guide to the painting of buildings AS 1627 - Metal finishing - Preparation and pretreatment of surfaces (series) AS 4361.1 - Guide to lead paint management: Industrial applications AS/NZS 1716 - Respiratory protective devices AS/NZS 1715 - Selection, use and maintenance of respiratory protective equipment AS/NZS 1270 - Acoustics - Hearing protectors AS/NZS 1580 - Paints and related materials - Methods of test
$67.96 $79.95 15% off
Buy This Document Buy Complete Painting Pack — Save $170
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Painting

5+ packs delivered to Australian tradies
$67.96 Buy Now