SOP — Hot Water System Installation (Gas)
5 work steps
0 hazards identified
0 control measures
5×5 risk matrix
Worker sign-off section
PPE Requirements
Safety footwear (anti-static) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Heat-resistant gloves (AS/NZS 2161.3)
Safety harness (height work) (AS/NZS 1891.1)
Portable gas detector (AS/NZS 60079.29.1)
Australian Standards Referenced
AS 5601.1 — Gas installations — General installations
AS/NZS 3500.4 — Plumbing and drainage — Heated water services
AS/NZS 3500.1 — Plumbing and drainage — Water services
AS 4617 — Installation of gas appliances
$33.96
$39.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $195
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SOP Documents for Plumbing
$33.96
Buy Now