Hot Water System Installation (Gas) — Safe Work Method Statement

Safe work procedures for installing, connecting, and commissioning gas-fired hot water systems, including gas pipe connections, flue installation, and compliance with AS 5601 and AS/NZS 3500.

5 work steps 9 hazards identified 9 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Chemicals Hazardous Atmosphere

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) — work involving gas WHS Reg 2011, Reg 60 — manual tasks WHS Reg 2011, Reg 50 — hazardous atmospheres

PPE Requirements

Safety footwear (anti-static) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Heat-resistant gloves (AS/NZS 2161.3) Safety harness (height work) (AS/NZS 1891.1) Portable gas detector (AS/NZS 60079.29.1)

Australian Standards Referenced

AS 5601.1 — Gas installations — General installations AS/NZS 3500.4 — Plumbing and drainage — Heated water services AS/NZS 3500.1 — Plumbing and drainage — Water services AS 4617 — Installation of gas appliances
$16.96 $19.95 15% off
Buy This Document Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Plumbing

5+ packs delivered to Australian tradies
$16.96 Buy Now