Roof Plumbing (Gutters and Downpipes) — Safe Work Method Statement

Safe work procedures for installing, repairing, and replacing roof guttering, fascia, downpipes, and rainwater heads per AS/NZS 3500.3 and fall prevention requirements.

A Safe Work Method Statement (SWMS) is a legal requirement under WHS Regulations for any high-risk construction work in Australia. It identifies hazards, assesses risks using a 5×5 matrix, and sets out control measures following the hierarchy of controls. Our SWMS documents reference specific WHS Regulation clauses and AS/NZS standards for every piece of PPE, giving you audit-ready documentation that satisfies regulator requirements in every state and territory.

5 work steps 7 hazards identified 7 control measures 6 PPE items specified 4 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Fall 2m

Legislation Referenced

WHS Reg 2011, Reg 78 — management of risk of fall WHS Reg 2011, Reg 306 — high risk construction work involving risk of fall

PPE Requirements

Safety harness and lanyard (AS/NZS 1891.1) Hard hat (AS/NZS 1801) Safety footwear (non-slip) (AS/NZS 2210.3) Cut-resistant gloves (AS/NZS 2161.3) Hearing protection (AS/NZS 1270) Safety glasses (AS/NZS 1337.1)

Australian Standards Referenced

AS/NZS 3500.3 — Plumbing and drainage — Stormwater drainage AS/NZS 1891.1 — Industrial fall-arrest systems and devices — Harnesses and ancillary equipment AS/NZS 1170.2 — Structural design actions — Wind actions AS 1562.1 — Design and installation of sheet roof and wall cladding — Metal
$67.95
Buy This Document Buy Complete Plumbing Pack — Save $459
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Not sure your existing swms is compliant? Run the free WHS compliance check →

Also Available As

Using This SWMS On Site

Keep the SWMS where the work is being carried out and have it available if the principal contractor asks for it. Workers named on it sign the acknowledgement page before starting, and it gets reviewed whenever the method, the site conditions or the crew change.

SWMS — Common Questions

When is a SWMS legally required?

Under WHS Regulation 299, a SWMS must be prepared before any high-risk construction work (HRCW) begins. This includes work at heights, demolition, work near energised electrical, excavation over 1.5m, and 18 other defined activities.

What should a SWMS include?

A compliant SWMS must identify the high-risk work, list hazards and risks, describe control measures using the hierarchy of controls, and be signed by the workers involved. Our documents include all required elements plus specific legislation references.

Who needs to sign a SWMS?

The PCBU (or employer in Victoria) who commissions the work, and every worker carrying out the high-risk construction work, must sign the SWMS before work begins.

More SWMS Documents for Plumbing

Not the right fit? Refund available if the document doesn't match your trade.
$67.95 Buy Now