Drainage Installation (Commercial) — Safe Work Method Statement

Safe work procedures for installing commercial drainage systems including large-diameter sanitary, trade waste, and stormwater pipework in commercial buildings per AS/NZS 3500.2.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Trenching Powered Mobile Plant

Legislation Referenced

WHS Reg 2011, Reg 306 — excavation work WHS Reg 2011, Reg 60 — manual tasks WHS Reg 2011, Reg 291 — high risk construction work

PPE Requirements

Hard hat (AS/NZS 1801) Safety footwear (AS/NZS 2210.3) Hi-vis clothing (AS/NZS 4602.1) Safety glasses / face shield (AS/NZS 1337.1) Waterproof gloves (AS/NZS 2161.3) Personal 4-gas monitor (AS/NZS 60079.29.1)

Australian Standards Referenced

AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage AS/NZS 3500.3 — Plumbing and drainage — Stormwater drainage AS 3600 — Concrete structures (for pit and manhole construction) AS/NZS 4602.1 — High visibility safety garments
$67.96 $79.95 15% off
Buy This Document Buy Complete Plumbing Pack — Save $459
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Plumbing

5+ packs delivered to Australian tradies
$67.96 Buy Now