SOP — Roof Sheeting (Metal)

6 work steps 0 hazards identified 0 control measures 5×5 risk matrix Worker sign-off section

PPE Requirements

Full body harness + retractable lanyard (AS/NZS 1891.1) Hard hat (AS/NZS 1801) Safety footwear (non-slip sole) (AS/NZS 2210.3) Safety glasses with side shields (AS/NZS 1337.1) Cut-resistant gloves (AS/NZS 2161.3) Class 5 hearing protection (AS/NZS 1270) High-visibility vest (AS/NZS 4602.1)

Australian Standards Referenced

AS/NZS 1891.1 — Industrial fall-arrest systems and devices AS/NZS 4994.1 — Temporary edge protection AS/NZS 4389 — Safety mesh for fall prevention AS/NZS 4576 — Guidelines for scaffolding safety AS/NZS 1270 — Acoustics — Hearing protectors AS/NZS 4602.1 — High visibility safety garments
$33.96 $39.95 15% off
Buy This Document Buy Complete Roofing Pack — Save $68
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SOP Documents for Roofing

5+ packs delivered to Australian tradies
$33.96 Buy Now