Roof Sheeting (Metal) — Safe Work Method Statement
Covers installation and replacement of metal roof sheeting including Colorbond, Zincalume, and corrugated iron on residential and commercial structures.
6 work steps
10 hazards identified
10 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Reg 291(1)(b) - Risk of fall into liquid or other substance
PPE Requirements
Full body harness + retractable lanyard (AS/NZS 1891.1)
Hard hat (AS/NZS 1801)
Safety footwear (non-slip sole) (AS/NZS 2210.3)
Safety glasses with side shields (AS/NZS 1337.1)
Cut-resistant gloves (AS/NZS 2161.3)
Class 5 hearing protection (AS/NZS 1270)
High-visibility vest (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 1891.1 — Industrial fall-arrest systems and devices
AS/NZS 4994.1 — Temporary edge protection
AS/NZS 4389 — Safety mesh for fall prevention
AS/NZS 4576 — Guidelines for scaffolding safety
AS/NZS 1270 — Acoustics — Hearing protectors
AS/NZS 4602.1 — High visibility safety garments
$16.96
$19.95
15% off
Buy This Document
Buy Complete Roofing Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Roofing
$16.96
Buy Now