Temporary Edge Protection Systems Installation — Safe Work Method Statement

Covers the installation, inspection, and removal of temporary edge protection systems including guardrail posts, mesh barriers, and safety netting on roof edges, floor openings, and open-sided structures.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Reg 306 - Use of safety net or fall arrest system WHS Reg 2011, Reg 78 - Duty to provide and maintain a safe workplace

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Scaffolding & Access Pack — Save $34
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Scaffolding & Access

5+ packs delivered to Australian tradies
$16.96 Buy Now