Dismantling and Removal of Scaffolding — Safe Work Method Statement
Covers the systematic dismantling of tube and coupler, modular, and system scaffolding including removal of platforms, guardrails, ties, and standards in reverse order of erection.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Structural Temp Support
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Reg 224 - Scaffolding work requiring a licence
WHS Reg 2011, Reg 226 - Dismantling of scaffolding
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Scaffolding & Access Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Scaffolding & Access
$16.96
Buy Now