Pool Shell Concrete (Shotcrete/Gunite) Application — Safe Work Method Statement
Safe work procedures for application of shotcrete or gunite to swimming pool shells including surface preparation, shotcrete spraying, trimming, and curing in accordance with AS 3600.
4 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011 r.306 (excavation work)
WHS Reg 2011 r.214 (management of risks to health and safety)
WHS Reg 2011 r.213 (duty to identify hazards)
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Swimming Pool Construction Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Swimming Pool Construction
$16.96
Buy Now