Swimming Pool Excavation and Benching — Safe Work Method Statement

Safe work procedures for excavation of swimming pool shells including bulk dig, benching, shaping to design profile, spoil removal, and dewatering operations.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Excavation Powered Mobile Plant

Legislation Referenced

WHS Reg 2011 r.291 (high risk construction work) WHS Reg 2011 r.306 (excavation work) WHS Reg 2011 r.307 (ground conditions — excavation) WHS Reg 2011 r.214 (management of risks to health and safety)

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Swimming Pool Construction Pack — Save $34
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Swimming Pool Construction

5+ packs delivered to Australian tradies
$16.96 Buy Now