Post-Tensioned Concrete — Safe Work Method Statement

Covers installation of post-tensioning ducts and tendons, stressing of strands using hydraulic jacks, grouting of ducts, and anchorage trimming for post-tensioned slabs, beams, and transfer structures.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Pressurised Gas Structural Temp Support

Legislation Referenced

WHS Reg 2011, Reg 291(1)(h) - Work involving pressurised substances WHS Reg 2011, Reg 36 - Duty to identify hazards WHS Reg 2011, Reg 305 - Formwork must be designed and erected by competent person

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Concreting Pack — Save $145
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Concreting

5+ packs delivered to Australian tradies
$67.96 Buy Now