Tilt-Up Precast Concrete Panels — Safe Work Method Statement

Covers casting, lifting, bracing, and erection of tilt-up precast concrete wall panels including casting bed preparation, embed placement, crane lifting, and permanent fixing on commercial and industrial projects.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Tilt Up Precast Powered Mobile Plant Working At Heights

Legislation Referenced

WHS Reg 2011, Reg 291(1)(p) - Tilt-up or precast concrete construction WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Reg 291(1)(l) - Work involving powered mobile plant

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Concreting Pack — Save $145
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Concreting

5+ packs delivered to Australian tradies
$67.96 Buy Now