Steel Reinforcement Fixing — Safe Work Method Statement

Covers delivery, storage, cutting, bending, placement, tying, and lapping of steel reinforcement bars and mesh for footings, slabs, walls, columns, and beams on residential and commercial projects.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Powered Mobile Plant

Legislation Referenced

WHS Reg 2011, Reg 291(1)(l) - Work involving powered mobile plant WHS Reg 2011, Reg 36 - Duty to identify hazards WHS Reg 2011, Reg 60 - Manual tasks involving risk

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Concreting Pack — Save $145
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Concreting

5+ packs delivered to Australian tradies
$67.96 Buy Now