Excavation and Earthworks — Safe Work Method Statement
Safe work procedures for excavation and earthworks including trenching, bulk excavation, benching, shoring, and working near underground services on construction and demolition sites.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Legislation Referenced
WHS Reg 2011, Reg 306 (excavation)
WHS Reg 2011, Reg 305 (ground conditions)
WHS Reg 2011, Reg 291(1)(c) (SWMS high risk)
PPE Requirements
Hard hat (AS/NZS 1801)
High-visibility vest (AS/NZS 4602.1)
Safety footwear (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hearing protection (AS/NZS 1270)
Australian Standards Referenced
Safe Work Australia Code of Practice — Excavation work
AS 2601 — The demolition of structures
AS/NZS 4602.1 — High visibility safety garments
$67.96
$79.95
15% off
Buy This Document
Buy Complete Demolition Pack — Save $255
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Demolition
$67.96
Buy Now