Residential Demolition (Partial/Strip-Out) — Safe Work Method Statement

Safe work procedures for partial demolition and internal strip-out of residential buildings including kitchen and bathroom removal, wall removal, and selective structural modification while maintaining building stability.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Demolition

Legislation Referenced

WHS Reg 2011, Reg 142 (demolition licensing) WHS Reg 2011, Reg 291(1)(d) (SWMS high risk)

PPE Requirements

Hard hat (AS/NZS 1801) Safety glasses (AS/NZS 1337.1) P2 respirator (AS/NZS 1716) Safety footwear (AS/NZS 2210.3) Cut-resistant gloves (AS/NZS 2161.3) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS 2601 — The demolition of structures Safe Work Australia Code of Practice — Demolition work AS/NZS 3000 — Wiring Rules Safe Work Australia Code of Practice — How to manage and control asbestos in the workplace
$67.96 $79.95 15% off
Buy This Document Buy Complete Demolition Pack — Save $255
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Demolition

5+ packs delivered to Australian tradies
$67.96 Buy Now