Residential Demolition (Full Structure) — Safe Work Method Statement

Safe work procedures for the complete demolition of residential buildings including pre-demolition hazard surveys, service disconnection, structural demolition sequence, material sorting, and site remediation per AS 2601.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Demolition Work At Height Falling Objects

Legislation Referenced

WHS Reg 2011, Reg 142 (demolition licensing) WHS Reg 2011, Reg 143 (demolition notification) WHS Reg 2011, Reg 291(1)(d) (SWMS high risk)

PPE Requirements

Hard hat (AS/NZS 1801) Safety glasses (AS/NZS 1337.1) P2 respirator (AS/NZS 1716) High-visibility vest (AS/NZS 4602.1) Safety footwear (steel cap) (AS/NZS 2210.3) Cut-resistant gloves (AS/NZS 2161.3) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS 2601 — The demolition of structures Safe Work Australia Code of Practice — Demolition work Safe Work Australia Code of Practice — How to manage and control asbestos in the workplace AS/NZS 1801 — Occupational protective helmets
$67.96 $79.95 15% off
Buy This Document Buy Complete Demolition Pack — Save $255
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Demolition

5+ packs delivered to Australian tradies
$67.96 Buy Now