Split System Air Conditioning Installation — Safe Work Method Statement
Safe work procedures for the installation of wall-mounted and multi-head split system air conditioning units including indoor/outdoor unit mounting, refrigerant pipework, drainage, and electrical connection.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Electrical Work
Work At Height
Legislation Referenced
WHS Reg 2011, Reg 147 (electrical work)
WHS Reg 2011, Reg 78 (falls)
WHS Reg 2011, Reg 291 (SWMS for high risk)
PPE Requirements
Safety glasses (AS/NZS 1337.1)
Insulated gloves (AS/NZS 2225)
P2 respirator (AS/NZS 1716)
Safety footwear (AS/NZS 2210.3)
Full body harness (for height work) (AS/NZS 1891.1)
Leather rigger gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 3823 — Performance of electrical appliances – Air conditioners and heat pumps
AS/NZS 3000 — Wiring Rules
AS/NZS 1677.2 — Refrigerating systems – Safety requirements for fixed applications
AS/NZS 5149 — Refrigerating systems and heat pumps – Safety and environmental requirements
AS/NZS 2225 — Insulating gloves for electrical purposes
AS/NZS 1891.1 — Industrial fall-arrest systems and devices
$67.96
$79.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Electrical / HVAC / Solar
$67.96
Buy Now