Split System Air Conditioning Installation — Safe Work Method Statement

Safe work procedures for the installation of wall-mounted and multi-head split system air conditioning units including indoor/outdoor unit mounting, refrigerant pipework, drainage, and electrical connection.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Electrical Work Work At Height

Legislation Referenced

WHS Reg 2011, Reg 147 (electrical work) WHS Reg 2011, Reg 78 (falls) WHS Reg 2011, Reg 291 (SWMS for high risk)

PPE Requirements

Safety glasses (AS/NZS 1337.1) Insulated gloves (AS/NZS 2225) P2 respirator (AS/NZS 1716) Safety footwear (AS/NZS 2210.3) Full body harness (for height work) (AS/NZS 1891.1) Leather rigger gloves (AS/NZS 2161.3)

Australian Standards Referenced

AS/NZS 3823 — Performance of electrical appliances – Air conditioners and heat pumps AS/NZS 3000 — Wiring Rules AS/NZS 1677.2 — Refrigerating systems – Safety requirements for fixed applications AS/NZS 5149 — Refrigerating systems and heat pumps – Safety and environmental requirements AS/NZS 2225 — Insulating gloves for electrical purposes AS/NZS 1891.1 — Industrial fall-arrest systems and devices
$67.96 $79.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$67.96 Buy Now