Landscape Drainage and Stormwater Work — Safe Work Method Statement

Covers excavation and installation of sub-surface drainage systems including agricultural drains, stormwater pits, PVC drainage pipe, rubble drains and connection to existing stormwater infrastructure. Includes trenching, pipe laying, backfilling and reinstatement.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Excavation

Legislation Referenced

WHS Reg 2011, Reg 291(1)(d) - Excavation to depth greater than 1.5m WHS Reg 2011, Reg 306 - Specific control measure — excavation work WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 36 - Hierarchy of control measures

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Landscaping Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Landscaping

5+ packs delivered to Australian tradies
$16.96 Buy Now