Turf Preparation and Laying — Safe Work Method Statement

Covers soil preparation, rotary hoeing, fine grading, fertiliser application and laying of rolled turf. Includes use of bobcat/skid-steer for soil spreading, hand tools for fine levelling, and mechanical turf cutters for removal of existing lawn.

5 work steps 9 hazards identified 9 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Fall 2m

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 36 - Hierarchy of control measures WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 44 - Duty to provide personal protective equipment

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Landscaping Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Landscaping

5+ packs delivered to Australian tradies
$16.96 Buy Now