Site Earthworks, Grading and Levelling — Safe Work Method Statement

Covers site clearing, cut-and-fill earthworks, grading and levelling operations using plant and hand tools. Includes soil compaction, removal of vegetation and debris, and establishment of finished surface levels to design specifications.

5 work steps 10 hazards identified 10 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Excavation Powered Mobile Plant

Legislation Referenced

WHS Reg 2011, Reg 291(1)(d) - Excavation to depth greater than 1.5m WHS Reg 2011, Reg 306 - Specific control measure — excavation work WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 36 - Hierarchy of control measures

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Landscaping Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Landscaping

5+ packs delivered to Australian tradies
$16.96 Buy Now