Irrigation System Installation and Trenching — Safe Work Method Statement
Covers trenching and installation of irrigation pipework, sprinkler heads, drip systems, solenoid valves and controllers. Includes connection to mains water supply, electrical wiring of controllers and solenoid valves, and system commissioning and pressure testing.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Legislation Referenced
WHS Reg 2011, Reg 306 - Specific control measure — excavation work
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 36 - Hierarchy of control measures
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$67.96
$79.95
15% off
Buy This Document
Buy Complete Landscaping Pack — Save $145
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Landscaping
$67.96
Buy Now