Timber and Block Retaining Wall Construction — Safe Work Method Statement

Covers construction of timber sleeper and concrete block retaining walls up to 1.5m height including excavation of footing, placement of drainage aggregate, backfilling, and installation of tie-back anchors where required.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Excavation

Legislation Referenced

WHS Reg 2011, Reg 291(1)(d) - Excavation to depth greater than 1.5m WHS Reg 2011, Reg 306 - Specific control measure — excavation work WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 36 - Hierarchy of control measures

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$67.96 $79.95 15% off
Buy This Document Buy Complete Landscaping Pack — Save $145
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →