Site Earthworks, Grading and Levelling — Safe Work Method Statement
Covers site clearing, cut-and-fill earthworks, grading and levelling operations using plant and hand tools. Includes soil compaction, removal of vegetation and debris, and establishment of finished surface levels to design specifications.
5 work steps
10 hazards identified
10 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011, Reg 291(1)(d) - Excavation to depth greater than 1.5m
WHS Reg 2011, Reg 306 - Specific control measure — excavation work
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
WHS Reg 2011, Reg 36 - Hierarchy of control measures
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$67.96
$79.95
15% off
Buy This Document
Buy Complete Landscaping Pack — Save $145
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Landscaping
$67.96
Buy Now